Skip to main content

About your Search

20121209
20121209
Search Results 0 to 8 of about 9
presented now. dpw initial application for this project included repaving work on 9th street and brian to 8th to 11th. dpw staff informed us the brian street segment will need two repairs. the schedule for this work is to be determined and dpw staff anticipate funding this segment with future gas tax, prop k or other available funding. we've kept the full amount program at dpw request. next is dolores. the draft we did bring you to in december. the project, dpw submitted dolores street pavement that project includes pedestrian enhancement. scheduled for construction in the fiscal year '14 and '15. there wasn't enough -- after funding higher ranking project, there weren't enough prop double a funds to fund all the eligible projects. the condition associate with this action, the condition which has been agreed to by dpw to fund the long street project unless dpw secures other funds. district six, safety projects. we recommended funding for two pet safety projects located in district six. one is mid clock crossing. it was identified in the neighborhood transportation plan. several of the trea
need to get dpw out there. really the main thing left is the grade. we need to adjust the grade and that is dpw, but we were told to hold off until this is done. so we stopped all work on it, just because of that reason. >> okay. >> anything further, mr. duffy? >> the final inspection still needs to be done. it's my understanding that there is probably going to be something needed to be done to secure a level landing at the gate, that would be accessible. the 3' gate. it's also going to meet opening pressure just like any door. so if there is some problems with the weight of the door, it has to have five times opening pressure with a kick plate on the door. so there are a lot of requirements that have to be met. i don't know why they are at with that. i don't know if it was stopped because the suspension and it might explain why a door isn't working properly. i can assure the board i suppose it has to meet accessibility standards in the code. we will obviously with the appeal and stuff like that, this one we'll be paying extra special attention to, because there are obviousl
. this is dpw order no. 180717, on for hearing today and we would like to hear first from the appellant. >> ladies and gentlemen, good evening. >> sir, did you ask for assisted listening device? we have one available. >> that would be nice. thank you very much. did you get it? are you person? >> yes. >> thank you so much. >> you are welcome. >> hello, hello. sorry. >> that is okay. take your time. it should be on? is it not already on? >> good evening. >> can you hear me? is it working if you talk through the microphone? >> i hear much better. good evening, ladies and gentlemen. i am here tonight and you probably have in front of you the pages that i have presented in which i was explaining my objection to the removal of a few trees. originally i intended to try to protect the 4 trees, but after an explanation and review with a friend of mine, who experienced in trees i finally reduced my intention to only one tree, which is called a ficus. which is located on across 1321. this tree is really beautiful, and any person that i told this tree was going to be removed told me wh
plan for that in a minute. other work we've done worked with dpw to develop an initial design concept for that connector road to show it's a feasible concept. we've done two rounds of extensive community outreach to share our work as well as interagency coordination with dpw, mta, cal train as well as other local agency partners. diving a little more into the community outreach we've done, we have worked through two prerobust rounds of outreach. first of those were back in spring. we did an open house and other presentation to present the work we had done in the first few months after we got that appropriation and get the community's feedback. we came back to the community in november to present our draft back recommendation how we incorporated a lot of that community feedback before coming here to the board. each of those rounds included an open house with pretty good solid participation as well as notification for that each round including multilingual efforts with efforts to everyone within a half a mile. additional fliers and businesses, neighborhoods, churches, community groups t
the appeal from the dpw and we were asked to do some things. we distributed keys and went with the hours of operations and applied for the property building permits that the department of building inspection and went through planning. so we have got gone through the dpw, dbi approved the plans. we haven't quite got it all signed off because we were told to stop on it somewhere along the line when the dbi permit got approved. we did the load studies for the people coming and going and access and push bars and the keys. so it's pretty easy to walk in and out of the door, it works and it can be accessible, if it needs to be. i'm not sure how you would get a wheelchair in the building once it's in there, but it's not a problem. we have to do something with the grade there, but we haven't finished a lot of this stuff and somebody was talking about the structure. we haven't completed it because we were told to stop on it. which they are all pretty simple things to complete, the structure. i think it's a good thing for the building. it keeps them clean and safe and it's for our tenants and we
it. so i would move to deny. >> would that be on the basis of the dpw order which reflects those issues? >> yes? >> okay. so that motion is made by commissioner lazarus to deny the appeal and uphold the permit. on the basis of the dpw order. vice president fung? >> aye. >> president hwang? >> aye. >> commissioner hurtado? >> aye. >> and commissioner honda? >> aye. >> that motion carries and the permit is upheld. thank you. >> i would like to call item no. 6 and i want to make sure that thetern for the appellant in that case is in the room. could you raise your hand if you are here, mr. girardi? excellent, just walked into the room. appeal no. 12-085, cambon connoisseur cooperative, inc. versus the zoning administrator. 33 cambon drive aka 6-85 cambon drive, appealing a letter of determination dated july 10 20 12 addressed to matthew girardi regarding whether a medical cannabis dispensary use would be permitted at the subject property. >> my name is matthew girardi and i'm a lawyer and represent the managing patient members of a proposed collective called cambon conno
of the transit center project. this is actually within that phase one project. we looking to meet with dpw the next main point of discussion how the environmental phase of that project will move forward. >> i just wanted to mention as far as the masonic, i think the district 11 definitely under serve as it relates to transit dollars. of course the bike rider in that particular part in district five it's very high. this has been one of those -- i think there should be more maybe conversation negotiation around some of this but certainly this has been one of the areas where bicyclist have been -- i know there have been two fatalities that i can think it. there does need to be attention given to providing a safer environment for bike pad purposes. you think that might be one of the reasons behind prioritizing this in the way that we have. it's part of obviously different picture. i wanted to make sure i put that out there. >> top two projects here, this is really unique project. it's in the middle of the park. it touches three different districts. actually in the prop double a program, we're
in sunset out in irving street. i should come out here every week, the dpw folk are cleaning the streets pretty well. [laughter] >> it's great to see all of you here today. you know, earlier this year, particularly during the budget negotiations, supervisor carmen chu and i and a number of other supervisors engaged in a lot of discussions about what our neighborhood small businesses could benefit from as we saw indications of our budget recovery. and clearly we understood and have always understood the role of small businesses. and they're the backbone of the city and our office of economic development was headed by todd who is here and joaquin is helping out with the investment neighborhood strategy. we wanted to really demonstrate that, our commitment. not just by saying it, but actually doing things that would really support our small business. scott and henry and many others, benny and others who have been around us know that my favorite thing is to go to a neighborhood commercial corridor like terra val or out in the sunset noriega and have meals or breakfast or a cup of coffee and
's existing radio systems amongst our fairious departments, police, fire, port, the dpw, rpd and of course the sfmta 700 megahertz, am i correct, radio system? so, i want to make sure we're aligning all of these system so we have effective uses of funds and resources it so there is as much alignment as possible so that we have the savings that we need. so, i think those are the questions that continually come up for me. not the need to replace the system. i think the need is very, very clear and i'm happy to support this today. i just want to make sure that conversation continues and i'm glad that it started. these meetings, in the past six months, but i do really want some answers about how we're going to share on these facilities and leases and what it's going to take to improve these facilities to meet the needs of our city and our communication system. >> yes, i'll be interacting with the mda and other departments. in fact, this particular project, we are recommended that the transportation agency co-locate their system, the bd system, thereby they share the existing fiber, existing wi
Search Results 0 to 8 of about 9